This is Abi, standing in the main bathroom.
Not only do we have pipes, but we have rock! We spoke to a couple of guys who were digging out a block a few houses down (which had many large piles of large rocks). They said that it looked like we had just about 1 cubic metre of rock, which is the 'tipping point' for getting charged for excessive rock. No word from the builder yet as to their opinion! We put a $10K allowance in the contract just in case, however we don't want to use too much of that, as there have been a number of 'necessary' variations (most of which, unforeseen by us, but foreseeable by the builder) which we'll need that stash for. (These include steps from the garage to account for a 600mm fall towards the back of the block, and having to move the sewer point because it was under the garage site.)